TRAFFIC ALERT: On Friday, May 24 the Hawthorne and Morrison bridges will close to all motorized vehicles from 8:00 p.m. to 12:00 a.m. for the Portland Rose Festival fireworks show. Pedestrians and cyclists will still be able to use the bridges during those times. This closure is not weather dependent. Multnomah County is closing the bridges during this time because crowds often fill the bridges and cars stop to watch the fireworks. This can cause safety issues.
Multnomah County maintains five Willamette River bridges: the Sellwood, Hawthorne, Morrison, Burnside and Broadway Bridges as well as the Wapato Bridge over the Multnomah Channel. For information, visit: https://www.multco.us/bridges.