TRAFFIC ALERT: On Saturday, August 1 starting at 5:00 a.m. the Broadway Bridge will be closed to all motorized vehicles for crews to paint portions of the bridge. The Broadway Bridge will reopen at 11:30 p.m. Sunday, August 2. Use alternative routes. Sidewalks will remain open during this closure for cyclists and pedestrians.
Multnomah County maintains five Willamette River bridges: the Sellwood, Hawthorne, Morrison, Burnside and Broadway Bridges as well as the Wapato Bridge over the Multnomah Channel. For information, visit https://www.multco.us/bridges.