On Sunday, June 22, the Hawthorne Bridge will be closed to all motorized vehicles, pedestrians and cyclists from 6:00 a.m. to 6:00 p.m. for maintenance work. Crews will be greasing the counterweight cables which is part of regular maintenance for the bridge. Use alternative routes.
This closure is weather dependent. Sunday June 29 during the same time frame is the backup date for this closure.
Multnomah County maintains five Willamette River bridges: the Sellwood, Hawthorne, Morrison, Burnside and Broadway Bridges as well as the Wapato Bridge over the Multnomah Channel. For information, visit: https://www.multco.us/bridges.