Land Use Planning Fees

You may pay Land Use Planning fees through the Permit Portal with Mastercard, Visa or Discover.

FY 2027 Fee Schedule

Multnomah County Land Use fee schedule effective July 1, 2026.

You may pay Land Use Planning fees through the Permit Portal with Mastercard, Visa or Discover. If you prefer to pay by check, processing time varies and usually requires at least two weeks.

An application is considered received the same date the payment is received. If payment is submitted after 4:00 PM or outside of regular business hours, the application receive date will be the next business day.

Type I Action

Accessory Building/Structure Registration (per building/structure)$99
Address Assignment, Reassignment$868
Agricultural Building Review (per building)$201
Agricultural Fill Permit$986 deposit or full recovery deposit estimate ***
Agri-Tourism Permit / Farm Stand$1,206
Conditions of approval verification$471
Erosion and Sediment Control Permit$1,554
Floating Structure Placement Permit$412
Floodplain Development Permit$1,620
Health Hardship Renewal$274
Land Use Compatibility Statement Sign-off$289
Lot Consolidation/Legalization – Type I$1,238
Marijuana Business$1,508
Property Line Adjustment/Land Division Final$471
Sign Permit$207
Significant Environmental Concern – Type I$1,281
Time Extension of Decisions (in EFU/CFU/NSA)$1,807
Type A Home Occupation$282
Wireless Facilities Review Pursuant to Section 6409(a) of the Spectrum Act of 2012$675
Zoning Plan Check (new development, or new development and demo permit, or other site plan review)$527
  • Demo permit only, or revisions to previously approved plans
$324
  • Minimal Impact Project
$150
  • Stormwater Drainage Control
$150

Type II Action

Requires Notice Fee. Some involve deposits.**

Accessory Use Determination$3,748
Adjustment$2,766
Administrative Modification of Conditions$4,084
Appeal of Administrative Decision$250
Design Review$4,909
  • Limited Design Review per MCC 39.8020(B)
$1,807
Exceptions to CFU Safety Zone$901
Forest Development Standards$2,299
Geologic Hazards$3,840
Health Hardship Permit$797
Home Occupation - Type B & Non-Hearing Type C$3,183
Home Occupation Renewal (Type B & C)$671
Land Division (Category 3 & 4)$6,044
Lot Legalization - Type II$6,044
Lot of Exception$901
Lot of Record/Legal Parcel Determination (per LOR / Legal Parcel request)

$2,245

 

National Scenic Area Expedited Review$1,189
National Scenic Area Expedited Review – Renewable Energy Systems$475
National Scenic Area Major Variance (No Hearing)$4,358
National Scenic Area Minor Variance (No Hearing)$2,766
National Scenic Area Site Review$4,786
National Scenic Area Site Review – Renewable Energy Systems$2,450
National Scenic Area Site Review – Emergency/Disaster Response for Septic Systems$4,358
New Forest Dwelling$10,235
Non-conforming Use$5,728 deposit or full recovery deposit estimate ***
Other Decision by Planning Director (includes Review Uses)$5,728 deposit or full recovery deposit estimate ***
Property Line Adjustment$4,228
Replat$4,722
Significant Environmental Concern (per SEC permit)$3,804
Temporary Permit$1,311
Time Extension (Not in EFU/CFU/NSA)$1,835
Willamette River Greenway$6,483

Type III Action Deposits**

Requires Notice Fee.

Conditional Use & Community Service **

$8,352 or full recovery deposit estimate***

 

Land Division (Category 1 & 2)**

$8,352 or full recovery deposit estimate ***

 

Other Hearing Case (Includes Variance or Planned Development)**

$8,352 or full recovery deposit estimate ***

 

Regional Sanitary Landfill**

$8,352 or full recovery deposit estimate ***

 

Type IV Action Deposits**

Requires Notice Fee.

Legislative or Quasi-Judicial Plan Revision**

$13,036 or full recovery deposit estimate ***

 

Legislative or Quasi-Judicial Zone Change**

$13,036 or full recovery deposit estimate ***

 

Miscellaneous

Aerial photograph map / photocopies and scans – per page (larger than 11”x17”) or CD$23
Hearing Sign – each$45
Inspection Fee (MIP, GH, ESC, AF, LF ) / Site Visit$568
Notice Fee* – Type II, III and IV$628
Photocopies and scans – per page (11” x 17” or smaller)$0.73
Pre-application Conference$2,335
Pre-filing Conference$1,007
Re-Notice Fee – Hearing$273
Research/Records Request**Actual Cost

Withdrawal of Type I or Type II Application

Before application status letter is writtenFull refund
After application status letter is written or before the Opportunity to Comment is mailed (Type II)Refund 50% of application fees
After Opportunity to Comment is mailed (Type II)Refund 30% of application fees
After draft written decision is written or application is incomplete for more than 180-daysNo refund

Withdrawal of Type III or Type IV Application

 

After application status letter is written

 

Remaining deposit funds will be refunded

 

Withdrawal of Appeal

Before hearing notice is mailed

 

Refund 50% of appeal fee

 

After hearing notice is mailedNo refund

 

*Notice fees are charged per 'T' case number (except where specified).

**Fee for applications processed under a deposit are calculated using the current hourly rate.

***The Planning Director has discretion to require the listed minimum deposit fee, or a full recovery deposit estimate fee (see below) when the total actual processing cost is estimated by the Planning Director to likely exceed the listed minimum deposit fee.

Full Recovery Deposit Estimate Fee (up to 120%)
A full recovery deposit estimate fee requires an upfront deposit of 100% of the actual projected processing cost as estimated by the Planning Director based on the project parameters and any additional information available. Additionally, any outside consultant costs required by the County for the project will be included in the estimate, and billed, at actual cost plus 20% administrative costs, to cover the County’s costs of administering the requisite contract. The 20% administrative cost will only be included in the Planning Director’s estimate, and billing, when an external consultant is used by the County. The full recovery deposit funds will be drawn down as needed to pay the actual invoices and any associated 20% admin fee on amounts paid, if applicable.

The final billing balance for all applications requiring a deposit will be calculated using the total actual processing costs to ensure full cost recovery. Additionally, any outside consultant costs required by the County for the project will be included in the final balance, and billed, at actual cost plus 20% administrative costs, to cover the County’s costs of administering the requisite contract. The 20% administrative cost will only be included in the final billing when an external consultant is used by the County.


For information about Transportation fees, please see their Transportation Planning and Development Review page.

Last reviewed July 1, 2026