Land Use Planning Fees

You may pay Land Use Planning fees through the Permit Portal with Mastercard, Visa or Discover.

Fee schedule effective July 1, 2025.
Effective July 1, 2025 per Multnomah County Board Resolution 2025-043.

You may pay Land Use Planning fees through the Permit Portal with Mastercard, Visa or Discover. If you prefer to pay by check, processing time varies and usually requires at least two weeks.

An application is considered received the same date the payment is received. If payment is submitted outside of regular business hours, the application receive date will be the next business day.

Type I Action

Accessory Building/Structure Registration (per building/structure)$77
Address Assignment, Reassignment$678
Agricultural Building Review (per building)$157
Agricultural Fill Permit$770 deposit or full recovery deposit estimate ***
Agri-Tourism Permit / Farm Stand$942
Conditions of approval verification$368
Erosion and Sediment Control Permit$1,214
Floating Structure Placement Permit$322
Floodplain Development Permit$1,266
Health Hardship Renewal$274
Land Use Compatibility Statement Sign-off$226
Lot Consolidation/Legalization – Type I$976
Marijuana Business$1,178
Property Line Adjustment/Land Division Final$368
Sign Permit$162
Significant Environmental Concern – Type I$1,001
Time Extension of Decisions (in EFU/CFU/NSA)$1,412
Type A Home Occupation$220
Wireless Facilities Review Pursuant to Section 6409(a) of the Spectrum Act of 2012$527
Zoning Plan Check (new development, or new development and demo permit, or other site plan review)$527
  • Demo permit only, or revisions to previously approved plans
$253
  • Minimal Impact Project
$117
  • Stormwater Drainage Control
$117

Type II Action

Requires Notice Fee. Some involve deposits.**

Accessory Use Determination$2,928
Adjustment$2,161
Administrative Modification of Conditions$3,191
Appeal of Administrative Decision$250
Design Review$3,835
  • Limited Design Review per MCC 39.8020(B)
$1,412
Exceptions to CFU Safety Zone$704
Forest Development Standards$1,796
Geologic Hazards$3,000
Health Hardship Permit$797
Home Occupation - Type B & Non-Hearing Type C$2,487
Home Occupation Renewal (Type B & C)$524
Land Division (Category 3 & 4)$4,722
Lot Legalization - Type II$4,722
Lot of Exception$704
Lot of Record/Legal Parcel Determination (per LOR / Legal Parcel request)

$1,754

 

National Scenic Area Expedited Review$929
National Scenic Area Expedited Review – Renewable Energy Systems$371
National Scenic Area Major Variance (No Hearing)$3,405
National Scenic Area Minor Variance (No Hearing)$2,161
National Scenic Area Site Review$4,786
National Scenic Area Site Review – Renewable Energy Systems$1,914
National Scenic Area Site Review – Emergency/Disaster Response for Septic Systems$3,405
New Forest Dwelling$7,996
Non-conforming Use$4,475 deposit or full recovery deposit estimate ***
Other Decision by Planning Director (includes Review Uses)$4,475 deposit or full recovery deposit estimate ***
Property Line Adjustment$3,303
Replat$4,722
Significant Environmental Concern (per SEC permit)$2,972
Temporary Permit$1,024
Time Extension (Not in EFU/CFU/NSA)$1,776
Willamette River Greenway$5,065

Type III Action Deposits**

Requires Notice Fee.

Conditional Use & Community Service **

$6,525 or full recovery deposit estimate***

 

Land Division (Category 1 & 2)**

$6,525 or full recovery deposit estimate ***

 

Other Hearing Case (Includes Variance or Planned Development)**

$6,525 or full recovery deposit estimate ***

 

Regional Sanitary Landfill**

$6,525 or full recovery deposit estimate ***

 

Type IV Action Deposits**

Requires Notice Fee.

Legislative or Quasi-Judicial Plan Revision**

$10,184 or full recovery deposit estimate ***

 

Legislative or Quasi-Judicial Zone Change**

$10,184 or full recovery deposit estimate ***

 

Miscellaneous

Aerial photograph map / photocopies and scans – per page (larger than 11”x17”) or CD$18
Hearing Sign – each$54
Inspection Fee (MIP, GH, ESC, AF, LF ) / Site Visit444
Notice Fee* – Type II, III and IV$491
Photocopies and scans – per page (11” x 17” or smaller)$0.71
Pre-application Conference$2,335
Pre-filing Conference$787
Re-Notice Fee – Hearing$213
Research/Records Request**Actual Cost

Withdrawal of Type I or Type II Application

Before application status letter is writtenFull refund
After application status letter is written or before the Opportunity to Comment is mailed (Type II)Refund 50% of application fees
After Opportunity to Comment is mailed (Type II)Refund 30% of application fees
After draft written decision is written or application is incomplete for more than 180-daysNo refund

Withdrawal of Type III or Type IV Application

 

After application status letter is written

 

Remaining deposit funds will be refunded

 

Withdrawal of Appeal

Before hearing notice is mailed

 

Refund 50% of appeal fee

 

After hearing notice is mailedNo refund

 

*Notice fees are charged per 'T' case number (except where specified).

**Fee for applications processed under a deposit are calculated using the current hourly rate.

***The Planning Director has discretion to require the listed minimum deposit fee, or a full recovery deposit estimate fee (see below) when the total actual processing cost is estimated by the Planning Director to likely exceed the listed minimum deposit fee.

Full Recovery Deposit Estimate Fee (up to 120%)
A full recovery deposit estimate fee requires an upfront deposit of 100% of the actual projected processing cost as estimated by the Planning Director based on the project parameters and any additional information available. Additionally, any outside consultant costs required by the County for the project will be included in the estimate, and billed, at actual cost plus 20% administrative costs, to cover the County’s costs of administering the requisite contract. The 20% administrative cost will only be included in the Planning Director’s estimate, and billing, when an external consultant is used by the County. The full recovery deposit funds will be drawn down as needed to pay the actual invoices and any associated 20% admin fee on amounts paid, if applicable.

The final billing balance for all applications requiring a deposit will be calculated using the total actual processing costs to ensure full cost recovery. Additionally, any outside consultant costs required by the County for the project will be included in the final balance, and billed, at actual cost plus 20% administrative costs, to cover the County’s costs of administering the requisite contract. The 20% administrative cost will only be included in the final billing when an external consultant is used by the County.


For information about Transportation fees, please see their Transportation Planning and Development Review page.

Last reviewed July 1, 2025