Case Number:
Document
T2-2025-0057
(9.51 MB)
Proposal: Request for a Planning Director’s Decision and Limited Design Review to alter a utility facility by removing an existing aboveground valve facility and constructing a new natural gas pipeline that will tie into existing pipeline.
Appeal Deadline: July 9, 2026