Earthquake Ready Burnside Bridge
We are taking the lead in making the Burnside Bridge earthquake-ready. The project is in the design phase. The project will ensure we have a bridge that can withstand a major earthquake and remain open to all forms of travel. Construction is expected to begin in 2025.
Broadway Bridge Lift Deck Replacement
In 2025, we will replace the deck of the Broadway Bridge's lift spans.
In 2025, we will add titanium rebar to strengthen approaches to the Morrison Bridge, and replace the motors and brakes that open and close the movable span.
The Stark Street Bridge over the Sandy River, east of Troutdale, is closed for repairs after a retaining wall collapsed on the northwest approach. Repairs are expected to take several months.
Recent Projects
- Morrison Bridge Ramp Paving (2024)
- Hawthorne Bridge Paving and Repair (2024)
- Morrison Bridge Painting Project (2022-2023)
- Burnside Bridge Maintenance Project (2018-2020)
- Broadway Bridge Rall Wheel Project (2017-2018)
- Broadway Bridge Control System Upgrade (2021)
- Broadway Bridge Painting Project (2015-2016)
- Hawthorne Bridge Beam Strengthening (2019-2020)
- Hawthorne Bridge Westside Ramp Project (2019)
- Hawthorne Bridge Concrete Crossbeam Repairs
- Morrison Bridge lift span deck replacement
- Sellwood Bridge Replacement Project
- Willamette River Bridge Capital Improvement Plan (2015)