- Location: NW Rocky Point Road, 1500’ south of Hwy 30 (map)
- Schedule: Completed fall 2025
- Estimated Cost: $450,000
- Funding Source: Local Funds
Project Description
We removed and replaced a failed culvert that was causing a sinkhole next to NW Rocky Point Road. The old 18” culvert was replaced with a 24” culvert to reduce the chance of future road failure.