In summer 2025, we replaced a failed culvert on NW Rocky Point Road.

Project Information

map of the road detour described in the text
Traffic detour
  • Location: NW Rocky Point Road, 1500’ south of Hwy 30 (map)
  • Schedule: Completed fall 2025
  • Estimated Cost: $450,000
  • Funding Source: Local Funds

Project Description

We removed and replaced a failed culvert that was causing a sinkhole next to NW Rocky Point Road. The old 18” culvert was replaced with a 24” culvert to reduce the chance of future road failure.


We are interested in your feedback on this project. Please fill in the form below if you have comments, questions or suggestions.

Last reviewed November 6, 2025