Latourell Road Bridge Replacement

The project replaced a deteriorated timber bridge on NE Latourell Road with a 24-foot-wide concrete slab structure in summer/fall 2022.

This page includes documents or other content that may not meet accessibility standards.

This page includes documents or other content that may not meet accessibility standards.

Documents marked “archived” may not work with assistive technologies. Request content in an accessible format.

Project Information

A side view of a small wooden bridge with a white wooden fence over a creek.
The old bridge over Latourell Creek in Columbia River Gorge
  • Location: NE Latourell Road over Latourell Creek in the Columbia River Gorge (see location map)
  • Schedule: Construction took place in 2022.
  • Cost: $2.6 million
  • Funding Source: State Fund Exchange

Project Description

The project replaced a deteriorated timber bridge with a 24-foot-wide and 38-foot long concrete slab structure. Construction was scheduled during the summer/fall in-water work period in 2022 to reduce impacts on migrating fish. Several trees were removed near the bridge.

Public Involvement


Last reviewed November 29, 2022