September 18, 2024

TRAFFIC ALERT: On Saturday, Sept. 21 at 6:00 a.m., the Hawthorne Bridge will close to all motorized vehicles, pedestrians and cyclists. The bridge will reopen at 6:00 p.m. Sunday, Sept. 22. This is part of an ongoing paving and repair project on the bridge. 

For project information, visit: https://multco.us/hawthornepaving.

Multnomah County maintains five Willamette River bridges: the Sellwood, Hawthorne, Morrison, Burnside and Broadway Bridges as well as the Wapato Bridge over the Multnomah Channel. For information, visit https://www.multco.us/bridges.