Dairy Creek Bridge on Reeder Road
The county supported a project that replaced a culvert that carries Dairy Creek below Reeder Road on Sauvie Island with a new bridge. The project reconnected the Columbia River to Sturgeon Lake.
The county supported a project that replaced a culvert that carries Dairy Creek below Reeder Road on Sauvie Island with a new bridge. The project reconnected the Columbia River to Sturgeon Lake.
Four crosswalks in downtown Troutdale will be upgraded with ramps for pedestrian safety.
We are improving road drainage by replacing 400 feet of an aging culvert on Foster Road, near Pleasant Valley Elementary.
A slow moving landslide damaged a portion of NW Germantown Rd. The 2018 project repaired the slope, replaced the culvert, and realigned the road away from the slope.
This project will improve stormwater treatment along part of NE Glisan St in Wood Village. We will replace the existing stormwater system with an Underground Injection Control system.
Completed Summer 2015. Two crosswalks with flashing beacons were installed to improve safety along Halsey Street, west of Wood Village Boulevard and east of 213th Avenue.
Replacement of culvert and catchbasin on NW Laidlaw Road to stop flooding.
We are paving and repairing E Larch Mountain Road. The upper half of the road will receive a fresh asphalt surface, and in many places the contractor will dig out the full roadbed for repair.
The project replaced a deteriorated timber bridge on NE Latourell Road with a 24-foot-wide concrete slab structure in summer/fall 2022.
This project installed a cross-culvert catch basin across SE Lusted Road and a guardrail along the project area.
This project will remove and replace a failing culvert.
A landslide that has closed NW Newberry Road in the west hills has been repaired. The road reopened to traffic on April 17, 2019.