Repairs will be made to the structure, road surface and electrical and mechanical systems.

In 2015 Multnomah County took a look at the six Willamette River bridges it maintains to see if any of them need repairs or improvement. We wrote a report about what we learned called the Willamette River Bridges Capital Improvement Plan (CIP).

The plan shows the Burnside Bridge needs the most repairs. The Burnside Bridge is located in the heart of downtown and serves many people. Their safety is important. For that reason, we decided to make it the first bridge to improve.

What repairs need to be made?

The Burnside Bridge Maintenance Project will make sure the bridge is safe and keep it working for another 15 to 20 years. The bridge has a number of problems that need to be fixed now:

  • Some of the concrete is cracked and crumbling
  • The electrical system and the parts that raise the bridge need upgrades
  • The steel framework on the bridge is rusting

When will the repairs be made?

Project planning was completed 2016. Construction began in spring 2017 and will last through the fall of 2019. 

What parts of the bridge will get repaired?

The Burnside Bridge Maintenance Project will make improvements along the west approach, main bridge spans and east approach. The project extends from 1st Avenue on the west across the length of the bridge to 2nd Avenue on the east.

Repairs will focus on three major areas of the bridge – the road surface, the bridge structure and electrical and mechanical systems. 

Some of the surface repairs will be:

  • Spot repairs to pavement, sidewalks, overhangs and railings
  • Replacing expansion joints (which allow bridge sections to expand and contract with temperature change)
  • Sign painting

Some of the structural repairs will be: 

  • Repairing cracks in the piers
  • Repairing the concrete columns that hold up the bridge, including the beams and girders which make the columns strong
  • Painting steel trusses (the framework under the bridge that holds up the roadway)
  • Repairing the inside of the internal steel towers that are connected to the piers

Some of the mechanical/electrical repairs will be:

  • Replacing the drawbridge span locks and motor 
  • Upgrading the power supply and drawbridge controls

Where is construction happening now?

Current construction is happening under the east approach to the bridge on either side of SE/NE 3rd Avenue.  The work is not impacting traffic. See our latest project fact sheet.  Burnside Bridge Maintenance Project Fall 2017 (1.43 MB).

What is the traffic plan in 2018?

This graphic shows the traffic plan for work on the bridge in 2018. Download this file to expand view  Burnside Bridge maintenance project traffic plan 2018 PDF (703.37 KB)

Burnside Bridge maintenance project traffic plan 2018

How much will the repairs cost?

The improvements are estimated to cost $18-22 million.

Who's involved?

Multnomah County owns the bridge. HDR Inc. designed the repairs. Hamilton Construction is the general contractor making the repairs.

Will the repairs make the bridge safer in an earthquake? 

While we’re repairing the bridge,we’ll also look for ways to make it safer during earthquakes. This is a separate project called the Burnside Bridge Seismic Feasibility Study. The Seismic Feasibility Study will last two to three years.

We will use the information from the study to come up with options on how to keep the bridge safe in an earthquake. We will discuss the options with Portland residents, business owners and community organizations. That way we can make sure we find the best solution for everyone.